Our ongoing jobs:

A Warehouse conversion to a 2 storey office building, located in Banagher, Co. Offaly. Check out the photo's in the above slideshow to see the before and after photo's of this project!

Scope of works completed by Finlay Ecofit Tullamore Ltd:

- Demolition to all internal walls, creating new windows opes and blocking up old

- Removal of old roof and external wall cladding

- Installation of new pre-cast concrete floors

- Build up of all external blockwork

- Build up of all internal blockwork

- Installation of all new Structural Steel

- Installation of new Kingspan insulated sheeting to roof

- Installation of new skylights to roof

- Installation of integrated aluminium gutters and downpipes

- Installation of new internal doors and internal glazing

- Installation of all new architrave and skirting

- Paint work to all internal areas

- Sewage and drainage system

- Installation of new suspended ceilings with 600mm x 600mm ceiling tiles               

In late June 2018 Finlay Ecofit Tullamore Ltd began the role of Main Contractor on the construction of a new build 2 storey dwelling near Mullingar, Co. Westmeath. This is a high spec project and Finlay Ecofit are very proud to be appointed as the Main Contractor for this job that will take 10 months to complete.

Check out the slideshow above on the right hand side to see the before, during and after photo's of this project!

Scope of works being completed by Finlay Ecofit Tullamore Ltd:

- Levelling of site and groundworks

- Excavating of ground and laying of new underground pipework and ducting

- Installation of all re-bar steel and concrete foundation work

- Build up of all internal and external blockwork

- Installation of all structural steel

- Installation of all reinforced concrete slabs and stairs

- Installation of the reinforced ring beam

- Installation of all insulation work (cavity insulation, floor insulation, drylining etc.)

- Installation of the roofing structure to the 2 storey area and flat roof area

- All internal plastering, boarding and painting

- Installation of all new rooflights and skylights

- Installation of all new internal doors

- Installation of all new architrave and skirting

- Installation of all external windows and doors

- Installation of the new external charred timber facade

- Installation of a new drainage and sewage system

- All electrical works

- All Plumbing and Mechanical works (Including Heat Recovery Ventilation)

- Installation of a new airtightness barrier around house

- Installation of new tiling to walls and floors

- Installation of all new floor to new dwelling 

Areas we work in:
Offaly, Westmeath, Meath, Laois, Kildare, Dublin, Wicklow, Carlow, Kilkenny, Tipperary, Limerick, Clare, Galway, Leitrim, Cavan, Roscommon, Longford, Midlands
Finlay Ecofit Tullamore Ltd.
17 Cloncollig Industrial Estate, Church Road, Tullamore, Offaly, Ireland
Company Registration Number: 500560  Phone: 057 9324796  |  E-mail: ecofitfinlay@gmail.com
Copyright © 2019 Finlay Ecofit Tullamore Ltd.